DELTA, B.C., November 19, 2026 – Construction is officially underway on a new materials recovery facility in Delta, B.C., a joint project involving Recycle BC, Miller Waste Systems, Orion Construction and Astria Properties. The project marks a major milestone in the modernization of British Columbia’s recycling infrastructure.
Located at 9336 River Road, the 145,000-square-foot facility will be designed to process a base capacity of approximately 120,000 tonnes of residential packaging and paper annually, with opportunity for future growth. Expected to be completed in 2028, the project will strengthen B.C.’s recycling network, improve processing efficiency, and support up to 200 jobs across construction and ongoing operations, including 60 to 70 permanent positions.

The new facility is a cornerstone of Recycle BC’s broader investment in recycling infrastructure, following its transition to managing post-collection services directly in June 2026. Developed in partnership with Recycle BC, the facility is being designed, built and will be operated by Miller Waste Systems, with Astria Properties providing development management, design coordination and permitting, and Orion Construction serving as construction partner.
“This facility is an important part of how we’re strengthening B.C.’s recycling system for the long term,” said Sam Baker, E
xecutive Director, Recycle BC. “By taking a more direct role in managing post-collection services and strengthening the infrastructure that supports them, we can improve how materials move and are tracked through the system, respond to changing recycling needs, and ensure British Columbians continue to have access to reliable recycling
services close to home.”
The project brings together Canadian companies and expertise to deliver modern recycling infrastructure in B.C. Miller Waste Systems, a 100 per cent Canadian-owned company with approximately 65 years of experience in waste collection, recycling and material recovery, is leading the design, construction and future operation of the facility. Nearly all processing equipment will be designed and fabricated in Canada, including technology supplied by Machinex Industries, a Canadian recycling equipment manufacturer with more than 55 years of industry experience.
“Designing a facility of this scale means thinking about both what the recycling system needs today and how those needs may change over time,” said Blair McArthur, CEO of Miller Waste Systems. “We’re drawing on decades of industry experience and Canadian manufacturing expertise to build a facility that can process materials efficiently, recover high-quality recyclables and adapt as packaging and collection systems evolve.”
The project will also create opportunities for local contractors, suppliers, and service providers throughout construction and ongoing operations, supporting economic activity in the region.
“This project represents a significant investment in the local economy, creating jobs and opportunities for businesses across the region,” said Joshua Gaglardi, President of Orion Construction. “From the skilled trades and local contractors helping bring the facility to life, to the permanent jobs it will support once operational, this is the kind of infrastructure investment that delivers lasting benefits for our communities.”
“Behind investments like these are teams with complementary expertise working toward a shared goal,” said David Basche, President of Astria Properties. “Bringing this facility to life takes close collaboration across industry, local government and the project team. It’s rewarding to see that collective effort taking shape in infrastructure that will serve British Columbians for years to come.”
The facility will incorporate optical sorting and AI-enhanced technologies to improve material identification, sorting efficiency, and recovery. Designed to accommodate both single-stream and multi stream recyclables, it will process materials through multiple sorting stages to help ensure collected material meet the quality standards required by verified recycling end markets. Real-time monitoring systems will support ongoing improvements in processing efficiency, while flexible facility design will allow operations to adapt to evolving packaging materials and collection systems.
Built on a 10.6-acre former construction and demolition landfill site, the facility will incorporate energy efficient technologies and sustainable design features, including high-efficiency processing motors, electric forklift capabilities and six electric vehicle charging stations.
The facility will also feature a dedicated 1,000-square-foot education space, where visitors will be able to observe recycling operations through an elevated viewing platform and camera systems. Education opportunities coordinated through Recycle BC will offer British Columbians a firsthand look at how recyclable materials are sorted, processed and prepared for new uses.
The Delta facility is part of a broader effort to strengthen B.C.’s recycling network, alongside upgrades to existing processing facilities in New Westminster and Kelowna. Together, these investments will improve processing efficiency, strengthen operational flexibility and support a more resilient recycling system for British Columbians.


